Armenian nuclear power plant suspends operation
Region
- 15 May, 2021
- 09:34
The Metsamor Nuclear Power Plant in Armenia has suspended operation due to the annual scheduled maintenance, during which the complete unloading of the reactor core will be carried out, Report informs referring to the plant’s website.
“On May 15, 2021, at 00:25 (GMT+4), the power unit No. 2 of the Metsamor Nuclear Power Plant began to shut down, and at 11:45 the power unit was disconnected from the power system of Armenia. The nuclear power plant stopped for an annual scheduled preventive maintenance for 141 days, which is due to the unprecedentedly large volume of work at the final stage of the program for extending the life of power unit No. 2 of the power plant,” reads the message.
Latest News
14:23
Iran must issue official apology for Nakhchivan – OPINION
Foreign policy14:17
Israel, US airstrikes kill over 3,000 Iranian soldiers
Region14:11
Qatar's Defense Ministry: Air Defense Forces repelling Iranian missile attack
Other countries14:10
Qatar condemns Iran's strikes on Azerbaijan
Region14:06
Azerbaijan, Uzbekistan discuss incident with Iranian drones in Nakhchivan
Foreign policy13:58
Armenia's Pashinyan happy as trade with Azerbaijan expands
Business13:53
Peskov: Iran has not sought Russia's help
Region13:48
Pashinyan: Presence of Russian military base in Armenia doesn't hinder plans to join EU
Region13:46
Photo
Video