Azeri-Chirag-Gunashli block of fields

BP begins seismic survey at Karabagh field in Azerbaijan's Caspian sector
Energy

BP begins seismic survey at Karabagh field in Azerbaijan's Caspian sector

  • 22 December, 2025
  • 11:56
US evaluates Azerbaijan's role in bringing its oil, gas resources to int'l markets
Energy

US evaluates Azerbaijan's role in bringing its oil, gas resources to int'l markets

  • 13 December, 2025
  • 12:58
BTC pipeline transports nearly 25 million tons of oil
Energy

BTC pipeline transports nearly 25 million tons of oil

  • 12 December, 2025
  • 15:09
Bakhtiyar Aslanbayli: Azerbaijan received approximately 60BCM of associated gas extracted from ACG
Energy

Bakhtiyar Aslanbayli: Azerbaijan received approximately 60BCM of associated gas extracted from ACG

  • 10 December, 2025
  • 11:46
Shah Deniz awards SDC platform jacket construction contract
Energy

Shah Deniz awards SDC platform jacket construction contract

  • 09 December, 2025
  • 13:36
BP to start development planning for Karabakh field after seismic studies
Energy

BP to start development planning for Karabakh field after seismic studies

  • 27 November, 2025
  • 15:10
Volume of BTC oil transportation via Türkiye drops over 6%
Energy

Volume of BTC oil transportation via Türkiye drops over 6%

  • 26 November, 2025
  • 11:20
ACG block to yield over 2 billion additional barrels through upgrades and new tech
Energy

ACG block to yield over 2 billion additional barrels through upgrades and new tech

  • 25 November, 2025
  • 14:30
BP: Thousands of barrels of oil will remain underground if sand problem isn't solved
Energy

BP: Thousands of barrels of oil will remain underground if sand problem isn't solved

  • 25 November, 2025
  • 11:42
Bakhtiyar Aslanbayli: BP in talks to expand its operations in Azerbaijan
Energy

Bakhtiyar Aslanbayli: BP in talks to expand its operations in Azerbaijan

  • 14 November, 2025
  • 15:59
Military parade dedicated to Victory Day held in Baku – UPDATED-6
Military

Military parade dedicated to Victory Day held in Baku – UPDATED-6

  • 08 November, 2025
  • 21:00
Tamam Bayatli: Karabakh project will not require creation of additional transport systems
Energy

Tamam Bayatli: Karabakh project will not require creation of additional transport systems

  • 07 November, 2025
  • 18:10
BP-Azerbaijan to pause seismic data collection at ACG during Karabakh survey
Energy

BP-Azerbaijan to pause seismic data collection at ACG during Karabakh survey

  • 07 November, 2025
  • 17:40
Over 106 million tons of oil produced from Azerbaijan's Chirag field
Energy

Over 106 million tons of oil produced from Azerbaijan's Chirag field

  • 07 November, 2025
  • 11:34
Energy minister: SOCAR, Uzbekneftegaz may build oil refinery in Uzbekistan - INTERVIEW
Energy

Energy minister: SOCAR, Uzbekneftegaz may build oil refinery in Uzbekistan - INTERVIEW

  • 06 November, 2025
  • 14:15
BP discloses ACG production volume for 9 months of 2025
Energy

BP discloses ACG production volume for 9 months of 2025

  • 06 November, 2025
  • 13:05
1 2 3 4 5 ... 46

The Azeri-Chirag-Gunashli (ACG) block of fields is the country's largest and strategically most important oil field complex, located in the Azerbaijani sector of the Caspian Sea. Initiated by an international consortium following the signing of a document on September 20, 1994, which went down in history as the "Contract of the Century," this project is the cornerstone of modern Azerbaijan's independent economy and global energy policy.

The block of fields is located approximately 120 kilometers east of Baku, with production taking place at sea depths ranging from 120 to 400 meters.

Key Indicators of the ACG Project

Under the new agreement (the "Contract of the New Century") signed in 2017 between the Government of Azerbaijan and international partners, the development period for the project has been extended until the end of 2049.

Indicator Data Operator BP (British Petroleum) Contract Term Extended to 2049 Main Export Route Baku-Tbilisi-Ceyhan (BTC) main export pipeline Active Production Platforms Chirag, Central Azeri, West Azeri, East Azeri, Deepwater Gunashli, West Chirag, Azeri Central East (ACE) Initial Reserves Over 1 billion tonnes (or about 7 billion barrels) of oil

Note: In 2024, after the Norwegian company Equinor sold its stake to SOCAR and exited the project, the State Oil Company of Azerbaijan Republic's (SOCAR) participating interest in ACG increased significantly.

Technological Development in the Realities of 2026: The ACE Platform

The ACG project is constantly being upgraded through new investments and technologies. The Azeri Central East (ACE) platform, representing the newest and most advanced phase of the project, plays a critical role in maintaining stable production.

Digitalization: ACE is the most highly technological and "smart" platform installed in the Caspian Sea. It can be largely controlled remotely from the shore—from the control center at the Sangachal terminal.

Production Stabilization: The ACE platform is capable of producing tens of thousands of barrels of additional oil daily to help slow the inevitable decline rates at naturally depleting fields.

Impact on the Global Economy and Security

ACG is not merely a commercial project; it is a serious geopolitical instrument:

Europe's Energy Security: Oil extracted from ACG is delivered via the BTC pipeline to the Mediterranean Sea (to the port of Ceyhan) and from there by tankers to European and global markets. This provides global markets with an alternative and reliable source of crude oil (the Azeri Light brand).

Macroeconomic Stability: Revenues from the sale of the project's profit oil are directed straight into the State Oil Fund of the Republic of Azerbaijan (SOFAZ). These funds ensure the formation of the country's strategic foreign exchange reserves, the financing of large-scale infrastructure projects (including the restoration of Karabakh), and the stability of the manat's exchange rate.